WM Logo-White.png

Whitley Manufacturing Co, Inc.

201 West First Street
PO Box 496
South Whitley, IN 46787 USA

1 (260) 723 5131

Whitley Modular Builders
2756 Fort Wayne Rd.
PO Box 505
Rochester, IN 46975-8613 USA
1 (574) 223-4934

Whitley East, LLC
64 Hess Rd
Leola, PA 17540 USA

1 (717) 656-2081
 

Whitley Evergreen Inc.
14219 Smokey Point Blvd
Marysville, WA 98271 USA

1 (360) 653-5790
 

COMPANY

FOLLOW US

  • White LinkedIn Icon
  • White Instagram Icon
  • White Facebook Icon
  • White Twitter Icon

FEATURED PROJECTS

modular building institute
capsys corp modular buildings

© Whitley Manufacturing Co. Inc, 2020

Education

Vanderwarkerdsc_9947.jpg

Match Charter School

 Hyde Park, Massachusetts 

To develop the classroom buildings needed, modular construction was the obvious choice. Through a collaborative effort, Commodore Builders......

Screen Shot 2019-07-03 at 2.12.37 PM.png

Cesar Chavez School

 Detroit, Michigan 

Whitley-Evergreen completed this innovative project along with Williams- Scotsman. The building was produced in sections at Whitley-Evergreen, Marysville.....

Screen Shot 2019-06-26 at 9.04.50 AM.png

Evans-Kimmel Hall

 Fort Wayne, Indiana 

Indiana Institute of Technology serves over 4,000 students from around the world. The school, located in downtown Fort Wayne, IN, is known for programs in.....

Screen Shot 2019-07-03 at 3.32.57 PM.png

Rogers-Yergens Hall

 Fort Wayne, Indiana 

Whitley, in cooperation with Grinsfelder Architects, took on the project with the guarantee that the students would have spacious and comfortable....

Screen Shot 2019-06-28 at 1.07.19 PM.png

Old Redford Academy

 Detroit, Michigan 

A repeat customer of Whitley Manufacturing, Old Redford Academy (ORA) chose to partner again with Innovative Modular Solutions to.....

Screen Shot 2019-06-28 at 1.45.59 PM.png

Shoreline Music Classrooms

 Shoreline, Washington 

The Shoreline School District of Washington State was expanding their music education program offerings and was in need of facilities to accommodate.....

Screen Shot 2019-07-03 at 1.48.11 PM.png

Marysville High School

 Marysville, Washington 

Whitley-Evergreen completed this innovative project along with Williams- Scotsman. The building was produced in sections at Whitley-Evergreen, Marysville.....

Screen Shot 2019-06-28 at 1.59.38 PM.png

Thea Bowman Academy

 Gary, Indiana 

The Thea Bowman Leadership Academy was founded on the belief that “educated citizens emerge as the true leaders of a community.....

Screen Shot 2019-07-03 at 1.23.50 PM.png

Dennis Haley

 Roslindale, Massachusetts 

The City of Boston Public Schools requested a proposal from Triumph Modular for a complete turn-key construction and installation of a classroom...

Screen Shot 2019-06-28 at 2.13.28 PM.png

Wellesley Pre School

 Wellesley, Massachusetts 

Wellesley is an affluent community near Boston that is very concerned about aesthetics, urban planning, and quality of life issues. Their school system.....

Screen Shot 2019-07-03 at 1.04.22 PM.png

Frank & Anne Oropeza Hall

 Fort Wayne, Indiana 

Continued, rapid growth in enrollment created a need for additional housing at the school.  Frank & Anne Oropeza Hall was designed as  a sister facility to.....

Screen Shot 2019-06-25 at 3.27.57 PM.png

French American School

Mercer Island, Washington 

Located on an island in Puget Sound, the French-American School educates children of the affluent community in both French and English, with the goal of.....

Screen Shot 2019-07-03 at 1.44.36 PM.png

Bremerton Center

 Ballard, Washington 

Whitley Evergreen (Marysville, Washington) partnered with Advanced Technology Construction (ATC) to complete the CDC. But, first, there....

Screen Shot 2019-07-03 at 1.19.15 PM.png

Ross School of Business

 Ann Arbor, Michigan 

McDonald Modular Solutions partnered with Whitley Manufacturing to provide additional space as part of the University of Michigan’s building...

Screen Shot 2019-07-03 at 1.14.50 PM.png

Top School

 Kent, Washington 

The Kent School District approved $4.8 million to build a new facility for The Outreach Program (TOP). The program prepares special needs students for their future....

Not seeing your building needs?